Otterhampton Primary - School Streets 2

Page 1 of 3

Closes 3 Dec 2024

Introduction

Otterhampton Primary School Streets

Welcome to the parent and resident survey for Otterhampton Primary School Streets. We would like your feedback on the School Streets that is currently being trialled on School Lane. We will use an anonymous summary of your responses to evaluate the success of the School Street and whether it should become permanent.

Please share your views with us

This consultation will run for 6 months from the start of the School Street, 3rd June until 3rd December 2024. This survey should take up to five minutes.

How long is the trial period?

The trial scheme commenced on 3rd June 2024 and is due to last for a total of 18 months. During these 18 months there is 6 month consultation window. This runs from 3rd June 2024 until 3rd December 2024.

After the consultation period has finished, it can be considered wheteher the scheme can become permanent. 

Source of image taken from www.openstreetmap.org accessed 15/09/2023

Thank you very much for taking the time to complete the following survey.

1. Which of these apply to you (select all that apply). *The School Street zone includes: School Lane, from Ship Lane and Church Hill entrance
(Required)
2. How do you usually travel in the School Street Zone, during the closure times? Select all that apply. *Park and Stride means driving most of the journey but parking away from your destination (outside the proposed School Street zone) and walking the last 5-10 minutes or more.
(Required)
3. How has the School Street changed your use of these modes of travelling, on the School Street during the drop off and pick up time?
(Required)
4. Now the School Street is in place, how much do you agree or disagree with these statements during the School Streets closure times?
(Required)
5. Do you think the School Street should continue beyond the trial period?
6. Do you have any further comments about the School Streets trial?